Barrick Rodeo Paste Fill

 
 

The Paste Fill Plant site…

is located to the south of the existing Goldstrike Roaster facility, and the majority of process equipment is predominantly located inside an enclosed pre-engineered (steel structure) building having approximate nominal dimensions of 72 feet wide, 168 feet long and 65 feet high. Major equipment located inside the process building includes shop fabricated slurry and water storage tanks c/w with pumps and agitators; disc filters; vacuum pumps; paste mixer; filter cake conveyor; positive displacement pump c/w power-pack; wet scrubber; compressed air plant. The building also houses the MCC equipment as well as control and laboratory rooms.

  • Completed | 2013

  • SQFT | n/A

  • Client | Bodell Construction