Composites One

 
 

A Stantine-Pioneeer Distribution Center …

GSL Provided Electrical installation services on this Warehouse in Salt Lake City. One third of the 85,000 SQ FT facility is utilized by Stantine-Pioneer for distribution with the remaining two thirds being reserved for future tenant improvements. A catalyst on site is temperature critical and required a natural gas generator for emergency power distribution. Work was considered to be within a Class 1 Division 2 location.

  • Completed | 2021

  • SQFT | 55,000

  • Client | Big-D Construction